Technical charts and project documentation used in UXO risk assessment
UXO RISK MANAGEMENT

UXO risk management for offshore, nearshore and onshore projects

Independent technical review that keeps the UXO risk assessment, the survey and clearance methodology, contractor documentation and the planned works aligned, from the first desk study to the residual-risk sign-off.

ONE PROCESS, THREE ENVIRONMENTS

UXO risk follows the works, wherever they take place.

Unexploded ordnance (UXO) lies on the seabed, in port basins and in the ground beneath construction sites across Central and Northern Europe. It comes from wartime bombing, former battlefields and military training areas, minefields and post-war sea dumping of munitions.

The environment changes the equipment and the contractors. The management logic stays the same: understand the hazard, relate it to the planned intervention, choose proportionate mitigation and prove that the residual risk is acceptable. BTC checks each of these steps independently, on the client's side.

PROJECT ENVIRONMENTS

Where we support projects

OFFSHORE

Offshore projects

Seabed works far from shore, where survey data are the only view of what lies on and below the seabed.

  • Wind farm foundations and jack-up positions
  • Export and array cables, pipelines
  • Geotechnical boreholes and CPTs
  • Anchoring and vessel positioning
NEARSHORE

Nearshore and port projects

Shallow water and the coastline, where marine and land methods meet and responsibilities easily blur.

  • Port expansion and dredging
  • Quay walls and breakwaters
  • Cable landfalls and directional drilling exits
  • Diving and shallow-water works
ONSHORE

Onshore projects

Construction sites where piling, excavation and drilling pass through ground that may contain bombs, shells or buried munitions.

  • Building foundations and piling
  • Roads, railways and utility corridors
  • Energy and industrial sites
  • Brownfields and former military areas
REFERENCE FRAMEWORKS

Based on CIRIA guidance and the International Mine Action Standards

We review documents and decisions against recognised guidance. It gives the client, the contractor and the reviewer a common language and a defensible basis for every conclusion.

ONSHORE

CIRIA C681

Unexploded ordnance (UXO): a guide for the construction industry

A staged approach for onshore construction: preliminary risk assessment, detailed risk assessment, risk mitigation and implementation. We use it to check that each stage rests on the one before it.

OFFSHORE / NEARSHORE

CIRIA C754

Assessment and management of unexploded ordnance (UXO) risk in the marine environment

The framework for marine projects, including the ALARP principle and the chain from risk assessment through survey and target investigation to the residual-risk sign-off.

SURVEY / CLEARANCE / QUALITY

IMAS

International Mine Action Standards

Standards for non-technical and technical survey, land release, clearance requirements, quality management and risk management. We use them as the reference for evidence, quality assurance and quality control, and for decisions to reduce or release areas.

PROJECT DOCUMENTS

From standard to site

Method statements, permits to work, specifications

Guidance only protects a project once it reaches the method statements, permits to work, survey specifications and acceptance criteria used on site. That is where we focus our review.

HOW WE WORK

Four stages of UXO risk management

The stages follow the CIRIA approach. We can review a single stage or follow the whole process.

01

Preliminary risk assessment

A desk study of historical and site data answering one question: is there a credible UXO hazard? We check the sources, the study area and whether the conclusion covers the planned footprint.

02

Detailed risk assessment

Hazard by ordnance type, depth and likelihood of encounter, related to each planned activity. We check the assumptions on burial depth, seabed migration and the activities assessed.

03

Risk mitigation

Proportionate measures: avoidance, survey, target investigation, clearance or an EOD watching brief. We review the survey specification, detection capability, acceptance criteria and method statements.

04

Implementation and sign-off

Fieldwork, anomaly disposition, deviations and closure records. We check traceability and whether the evidence supports the ALARP or residual-risk statement and its stated limits.

WHERE PROJECTS LOSE CONTROL

Common points of disconnect

01

The risk assessment and the work scope diverge

The assessment covers one footprint or depth, while the final construction method reaches beyond it.

02

Survey design is separated from the intervention

Line spacing, detection assumptions or target criteria are not tested against the actual plant, tools and tolerances.

03

The ALARP statement is read too broadly

A conclusion made for one task or location is treated as assurance for the wider site or for later project phases.

04

Changes do not return to the risk process

A route, borehole, dredge depth, pile position or sequence changes, but the UXO basis is not formally re-assessed.

INDEPENDENT SUPPORT

How BTC can support the project

RISK BASIS

UXO risk assessment review

Independent review of the hazard basis, assumptions, spatial limits, depth criteria and the link to the planned works.

METHODOLOGY

Survey and clearance methodology review

Whether the proposed method, coverage, equipment, acceptance criteria and verification steps fit the project task.

ALARP

ALARP and residual-risk documentation

Review of the evidence behind the conclusion, its stated limitations and the conditions under which it remains valid.

QA/QC

Contractor deliverable assurance

Checks of reports, survey records, anomaly disposition, traceability, deviations and closure evidence against the agreed scope.

DECISIONS

Technical comments and decision notes

Clear, structured findings for investors, project teams and contractors, including open issues and required actions.

CHANGE / DISCOVERY

Support after a change or an unexpected find

Technical review when UXO, suspect items or scope changes challenge the original risk basis or project assumptions.

PROJECT CONTEXTS

Typical applications

Support can cover a single review, a critical project stage or a wider client-side assurance role.

Offshore wind foundationsExport and array cablesPipelines and landfallsGeotechnical boreholesPort development and dredgingQuay walls and breakwatersRoads, railways and utilitiesFoundations and pilingEnergy and industrial sitesFormer military areas
WHEN TO INVOLVE BTC

The earlier a mismatch is found, the cheaper it is to correct.

01

Before tender or procurement

To define a defensible scope, information requirements, deliverables and acceptance criteria.

02

Before mobilisation

To verify that the contractor's method and controls match the project risk basis.

03

At a change point

When location, depth, tools, sequence or construction method change after the original assessment.

04

After an unexpected find

To establish what the discovery means for earlier assumptions, adjacent work areas and the next project decisions.

QUESTIONS AND ANSWERS

Frequently asked questions

What is a UXO risk assessment and when is it needed?

A UXO risk assessment establishes whether unexploded ordnance may be present on a site and what risk it poses to the planned works. It should be completed before any intrusive activity such as piling, drilling, excavation, dredging, trenching or anchoring. The best time is the feasibility or design stage, when mitigation is cheapest to plan.

What is the difference between CIRIA C681 and CIRIA C754?

CIRIA C681 is a guide for managing UXO risk on onshore construction projects. CIRIA C754 covers the assessment and management of UXO risk in the marine environment, including offshore and nearshore works. Both follow a staged approach from preliminary risk assessment to mitigation and sign-off.

What does ALARP mean in UXO risk management?

ALARP stands for "as low as reasonably practicable". A residual UXO risk is ALARP when further reduction would require effort or cost grossly disproportionate to the benefit. An ALARP statement is valid only for the area, depth, activity and assumptions it was made for.

How do the International Mine Action Standards apply to construction projects?

IMAS were written for humanitarian mine action. Their principles of non-technical and technical survey, evidence-based land release, clearance requirements and quality management are widely used as a reference for survey and clearance on commercial projects.

Does BTC carry out UXO survey or clearance?

BTC provides independent review and technical assurance on the client's side. Survey and clearance are carried out by specialist contractors and, where the law requires it, by state authorities.

PROJECT ENQUIRY

Independent UXO review for a current or planned project

Send a short description of the location, the planned works and the current project stage. We will propose a focused review or a broader technical assurance scope.